Call us:

phone

864-334-5085

Projects

ARC Flash – Automotive Manufacturer

Project Integration provided Arc Flash and Power Distribution Engineering Services for a major automotive manufacturer. The project include over 7,200 busses 44 substations. Services included:

Read more

Chemical Manufacturing Facility

Provided the environmental permitting, mechanical, piping, and utility design and construction oversight for a chemical manufacturing facility in North Carolina. Have since provided on-going environmental compliance support. The programs, systems and equipment provided included: Developed and Submitted Air Permit Application, Developed facility SWPPP and SPCC plans;

Read more

Power Systems Company

Completed an initial facility environmental gap analysis. Identified and closed compliance gaps. Developed an environmental and safety compliance management program and provide on-going environmental compliance management and safety program development and training for the company’s five (5) facilities located in PA, TX, CA, SC, and IL. The program includes:

Read more

Renewable Energy Power Project

Project Integration was contracted to provide project engineering and project management  assistance to the developers of a Renewable Energy facility in Charlotte, NC. Services included the following:

Read more

Secondary Aluminum Facility – Chlorine Injection System

Provided the design and construction oversight for a chlorine gas injection system in the cast house of a major aluminum supplier. The system was designed to deliver, control, and inject chlorine gas into aluminum furnaces for removal of impurities. The key elements of the project included:

Read more

Secondary Aluminum Facility – Environmental Compliance

Provide environmental compliance and process safety management support for the integrated aluminum facility. The areas of assistance include:

Read more

Specialty Textile Manufacturer – Carbon Bed Pollution Control

Designed, programmed and commissioned controls upgrade for the replacement of an obsolete control system. Services included the following:

Read more

Tier 1 Automotive Supplier – Hazardous Waste Delisting

Completed F006 hazardous waste delisting for a Tier 1 automotive supplier. The major phases of the project included:

Read more